Heat-Pump Water Heater Electrical Planning Checklist
Print this worksheet and bring your notes to your consultation. Updated September 23, 2026.
Use this worksheet before purchasing a replacement water heater or confirming delivery. It gathers the information your electrician and plumbing contractor need to define their work and agree on a practical installation sequence.
Gather information from documents and accessible exterior labels only. Leave covers in place and have a qualified electrician assess wiring, electrical protection, and connections.
1. Identify the proposed equipment
- Save the exact manufacturer, model number, and installation manual—not only the store listing.
- List any alternative model still under consideration so the estimate is not based on the wrong unit.
- Ask the installer to confirm the model meets the household’s hot-water needs.
- Have the required electrical supply and connection method confirmed from the manual.
Proposed model / manual location
Alternative model / decision deadline
2. Describe the existing installation
- Record whether the existing water heater is electric, gas, or another type.
- Photograph the heater and surrounding area from a safe, accessible position.
- Photograph the closed electrical panel and any safely visible exterior equipment labels.
- Note previous breaker trips, intermittent operation, or known electrical alterations.
- Tell the electrician about planned additions such as an EV charger or new cooking appliance.
Existing equipment and location
Known problems / other planned electrical work
3. Confirm location and access
- Ask the installation contractor to check the selected model’s space, operating environment, and service-access requirements.
- Confirm the plan for plumbing and condensate management with the appropriate installer.
- Discuss equipment sound if the location is near living or sleeping areas.
- Identify the delivery route, stairs, narrow openings, and access restrictions.
- Confirm whether the heater will remain in its current location or move.
Approved location / person confirming suitability
Delivery access / restrictions
4. Define the electrical scope
- Ask whether the existing circuit can be reused and what must be verified first.
- Confirm any new wiring, connection, protection, or panel work in the written estimate.
- Ask the electrician to explain the reason for any proposed panel changes.
- Discuss the route and access openings if new wiring is required.
- Assign responsibility for any required permits, inspections, and finish repairs.
Included electrical work
Exclusions / work by others
Questions to resolve before approval
5. Coordinate installation day
- Name the plumbing, electrical, and delivery contacts.
- Confirm who removes the old unit and when the new equipment can be connected.
- Agree on the expected hot-water interruption and any electrical interruption.
- Confirm who verifies readiness for startup under the manufacturer’s instructions.
- Establish how unexpected conditions or extra work will be approved.
Contacts and installation sequence
Planned dates / interruption window
6. Keep the closeout records
- Retain the final model information, manuals, invoices, and warranty documents.
- Ask for an explanation of completed electrical work and any updated circuit labels.
- Record inspection results when applicable.
- Have the installer explain normal operation and required owner maintenance.
- List unfinished items, a responsible person, and a follow-up date.
Records stored at
Open item / owner / due date
Turn your notes into a service plan
Bring the completed worksheet to Bolt Electric to discuss the electrical scope, access, and next steps for your Jacksonville property.
- Read the Jacksonville water-heater planning guide
- Electrical service and repair
- Request service or an estimate · (904) 701-3312
Equipment-specific instructions determine location suitability; general guidance does not replace the selected manufacturer’s manual. ENERGY STAR installation design considerations.